PRODUCTION PROJECTS

Denison South

The Denison South Project is located 150 km north of Roma in Queensland covering a total of 620 sq km of permitted area. The project encompasses 8 gas fields within 5 production licences supplied by 35 natural gas wells.

The Denison South area comprises 3 gas processing plants – the Yellowbank Central Treatment Plant (YCTP), the Merivale Gas Plant (MGP) and the Springvale Separation Facility (SSF). The infrastructure (Figure 5) collects gas from all the Denison South fields and provides compression, dehydration, hydrocarbon dewpoint control and CO2 removal of raw gas, processing it to sales quality gas.

The gas is transported to our customer in the east coast via our pipeline PPL 11 to the QGP meter station at the Westgrove receipt point.

Denison South at a glance:

  • ~ 620 sq km acreage (100% owned)
  • ~ 150km pipeline from the (YCTP) to Westgrove Junction meter station on the QGP
  • 35 natural gas wells
  • 3 gas compression plants
  • ~6.5 PJ/annum or 18 TJ/day installed capacity at YCTP
  • Low-cost options available to expand capacity to nameplate 11 PJ/annum or 30 TJ/day