The Denison North Project is located between the towns of Rolleston and Emerald in Queensland.
The project encompasses 6 gas fields within 5 production licences, covering a total area of 539 sq km with 37 natural gas wells.
The Rolleston Gas Plant (RGP) is the main processing and export facility for the Denison North Project whilst satellite facilities within the Arcturus, Springton and Yandina Fields provide field compression, produced water and condensate storage.
The gas is transported to our customers on the east coast via pipeline (PPL 10) to the Jemena Queensland Gas Pipeline (QGP) meter station at the Rolleston receipt point.
The gas is transported to our customer in the east coast via our pipeline PPL 11 to the QGP meter station at the Westgrove receipt point.
Denison North at a glance:
- ~ 539 sq km acreage (100% owned)
- ~ 150km pipeline to QGP meter station
- 37 gas wells
- 4 gas compression facilities
- ~6 PJ/annum or 16 TJ/d installed capacity at RGP
- Low-cost options available to expand capacity to nameplate 11 PJ/annum or 30 TJ/day